Gwang Myeong City monorail PPP(BTO) Project |
|
|
|
Project Summary |
|
- Total length = 10.243 km
- Station = 8 EA
- Depot = 1 EA - Tunnel : 2 EA |
|
|
Project Period |
|
|
|
Our Business Description |
|
- Project development / Basic Design / Financing
- Project Management |
|
|
|
|
|
|
|
|
|
Gangnam monorail PPP(BTO) Project |
|
|
|
Project Summary |
|
- Total length = 6.707 km
- Station = 10 EA
- Depot = 1 EA |
|
|
Project Period |
|
|
|
Our Business Description |
|
- Project development / Basic Design / Financing
- Project Management |
|
|
|
|
|
|
|
|
|
Yeouido Monorail PPP(BTO) Project |
|
|
|
Project Summary |
|
- Total length = 7.6 km
- Station = 12 EA
- Depot = 1 EA |
|
|
Project Period |
|
|
|
Our Business Description |
|
- Project development / Basic Design / Financing
- Project Management |
|
|
|
|
|
|
|
|
|
ilsan City Monorail PPP(BTO) Project |
|
|
|
Project Summary |
|
- Total length = 9.670km
- Station = 10 EA
- Depot = 1 EA |
|
|
Project Period |
|
|
|
Our Business Description |
|
- Project development / Basic Design / Financing
- Project Management |
|
|
|
|
|
|
|
|
|
Gwanak Monorail PPP(BTO) Project |
|
|
|
Project Summary |
|
- Total length = 15.2 km
- Station = 16 EA
- Depot = 1 EA |
|
|
Project Period |
|
|
|
Our Business Description |
|
- Project development / Basic Design / Financing
- Project Management |
|
|
|
|
|
|
|
|
|
Yongin LRT Project Design and Engineering |
|
|
|
Project Summary |
|
- Total length = 18.6 km
- Station = 15 EA |
|
|
Project Period |
|
|
|
Our Business Description |
|
- Basic Design/ Detail Design
- Depot Design and Engineering
- Station Design and Engineering |
|
|
|
|
|
|
|
|
|
|
|
Hanam- Jinzu National Railway PPP(BTL) Project |
|
|
|
Project Summary |
|
-Total Iength= 20.352km
- Earthwork= 6.670km - Stations= 2
- Bridges= 30 / 4.717km
- Tunnels= 17 / 8.965km |
|
|
Project Period |
|
|
|
Our Business Description |
|
- Project development / Basic Design / Financing
- Project Management |
|
|
|
|
|
|
|
|
|
Iksan-Sinli National railway PPP(BTL) Project |
|
|
|
Project Summary |
|
- Earthwork= 28.716km
- Stations= 5
- Bridges= 50 / 3.480km
- Tunnels= 5 / 1.903km |
|
|
Project Period |
|
|
|
Our Business Description |
|
- Project development / Basic Design / Financing
- Project Management |
|
|
|
|
|
|
|
|
|
Jechon -Ssangyong National Railway Project |
|
|
|
Project Summary |
|
- Project length: 16.704 km
- Main track 13.136km - Delta Track 3.568km,
- Earthwork : 5.521km - Tunnels : 3/6.551km,
- Bridges: 1/1.064km
- Stations: 3(Je-Chon, Huk-Suk, Ip-Suk Li) |
|
|
Project Period |
|
|
|
Our Business Description |
|
- Project development
- Basic & Detail Engineering
- Project Management |
|
|
|
|
|
|
|
|
|
Bu-San New port connection Railway Project |
|
|
|
Project Summary |
|
- Project length: 12.114 km
- Main track 12.114km
- Earthwork : 5.521km - Tunnels : 3.21km,
- Stations: 1 |
|
|
Project Period |
|
|
|
Our Business Description |
|
- Project development
- Basic & Detail Engineering
- Project Management |
|
|
|
|
|
|
|
|
|
|
|
|
Hagui-Gogi Toll Road PPP(BTO) Project |
|
|
|
Project Summary |
|
|
|
Project Period |
|
|
|
Our Business Description |
|
- Project development / Basic Design / Financing
- Project Management
¡Ø Appointed as a Potential Concessionaire |
|
|
|
|
|
|
|
|
|
Hwado-Yangpyung Toll road PPP(BTO) Project |
|
|
|
Project Summary |
|
- Total length = 18.636km |
|
|
Project Period |
|
|
|
Our Business Description |
|
- Project development / Basic Design / Financing
- Project Management
¡Ø Appointed as a Potential Concessionaire |
|
|
|
|
|
|
|
|
|
Gwangmyung-Seoul Toll road PPP(BTO) Project |
|
|
|
Project Summary |
|
|
|
Project Period |
|
|
|
Our Business Description |
|
- Project development / Basic Design / Financing
- Project Management |
|
|
|
|
|
|
|
|
|
Seoul-MunSan Toll road PPP(BTO) Project |
|
|
|
Project Summary |
|
|
|
Project Period |
|
|
|
Our Business Description |
|
- Project development / Basic Design / Financing
- Project Management |
|
|
|
|
|
|
|
|
|
Seoul-Pochun Toll road PPP(BTO) Project |
|
|
|
Project Summary |
|
|
|
Project Period |
|
|
|
Our Business Description |
|
- Project development / Basic Design / Financing
- Project Management |
|
|
|
|
|
|
|
|
|
YongDong NO.2 Toll road PPP(BTO) Project |
|
|
|
Project Summary |
|
|
|
Project Period |
|
|
|
Our Business Description |
|
- Project development / Basic Design / Financing
- Project Management |
|
|
|
|
|
|
|
|
|
Songhyun-Bulro Toll road PPP(BTO) Project |
|
|
|
Project Summary |
|
- Total length = 26.85 km |
|
|
Project Period |
|
|
|
Our Business Description |
|
- Project development / Basic Design / Financing
- Project Management |
|
|
|
|
|
|
|
|
|
|
|
|
GwangYang Container Terminal PPP(BTO) project |
|
|
|
Project Summary |
|
- 5 Berths(50,000 Ton-class), 1,750m Quay
- 90,000§³, Cargo Gears, Electric device |
|
|
Project Period |
|
|
|
Our Business Description |
|
- Project development / Financing
- Project Management
- Basic Design & Engineering |
|
|
|
|
|
|
|
|
|
|
|
Chilsung Middle school PPP(BTL) |
|
|
|
|
|
Kumhwa elementary school PPP(BTL) |
|
|
|
|
|
Haengguk elementary school PPP(BTL) |
|
|
|
|
|
Kogang high school PPP(BTL) |
|
|
|
|
|
Neungni elementary school PPP(BTL) |
|
|
|
|
|
Kuil elementary school PPP(BTL) |
|
|
|
|
|
Kumhwa elementary school PPP(BTL) |
|
|
|
|
Our Business Description |
|
- Project development / Financing
- Basic & Detail Engineering/ - Project Management |
|
|
|
|
|
|
|
|
|
|
|
Seo-Hak Leisure Complex Project |
|
|
|
Project Summary |
|
- Skiing Ground District = 636,513§³
- Golf Field District = 341,870§³
- Lodging District = 57,640§³ |
|
|
Project Period |
|
|
|
Our Business Description |
|
- Project development
- Basic & Detail Engineering
- Project Management |
|
|
|
|
|
|
|
|
|
|
|
Cairo Monorail project development ,Egypt |
|
|
|
<%if client <> "" then%>
Project Summary |
|
- Total Length = 52Km Station= 42 Nos.
- 7Star Hotel and Shopping Mall
- 5,000 Nos. Housing |
|
|
Project Period |
|
|
|
Our Business Description |
|
- Project Development / Financing
- Monorail design and System Integration
- Facility management |
|
|
|
|
|
|
|
|
|
Haramain High speed Railway (HHR) Kingdom of Saudi Arabia |
|
|
|
Project Summary |
|
- Total Length = 444Km (double track)
- Makkah ~Jeddah~Madinah |
|
|
Project Period |
|
|
|
Our Business Description |
|
- Korea Consortium organizing (Badr Consortium)
- Proposal Documentation
- System Integration provider |
|
|
|
|
|
|
|
|
|
Trinidad Tobago Railway project |
|
|
|
Project Summary |
|
- Total Length = 120 Km
- DBOM Project
- Infrastructure and Rolling stock, System |
|
|
Project Period |
|
|
|
Our Business Description |
|
- Project Development and Management,
- Korea consortium Organizing for bidding
- Basic Design and Engineering
- System provider |
|
|
|
|
|
|
|
|
|
Abu Dhabi Metro study Project |
|
|
|
Project Summary |
|
- Total Length = 132 Km
- Urban metro rail project based on STMP
- Feasibility study and Concept design |
|
|
Project Period |
|
|
|
Our Business Description |
|
- Korea Consortium organizing
- Project Management and proposal documentation
- Participation of bidding |
|
|
|
|
|
|
|
|
|
Urban rail Project Development in Kinshasa Democratic Republic of Congo |
|
|
|
Project Summary |
|
- Tram = 25 Km
- Monorail = 15 Km
- Existing urban rail rehabilitation = 21Km |
|
|
Project Period |
|
|
|
Our Business Description |
|
- Project Management
- Basic Design and Traffic demand forecasting
- Economic and financial feasibility study, |
|
|
|
|
|
|